Government Overview
What Government Would Get
Infrastructure, not another scheme. BuildROI would sit between homeowners, builders and compliance, producing evidence so that existing policy investment can be judged on data.
🏠 Retrofit Quality
An independent Project Manager checks every stage in person and takes the photos. Building Control requirements flagged and certificates stored. Less "trust me".
💷 Builder Pensions
Nothing is paid in the pilot. It records builders' interest in a pension, so any incentive can be designed on evidence.
🛠️ Skills Transition
Ex-builders working as Project Managers and mentors, with a trail of performance data to support succession planning.
✅ Compliance
Health and safety, Building Control and escrow documented, and designed to be audit-ready from day one.
Where BuildROI Would Create Audit-Ready Records
Before the project
- Builder credentials: insurance, CIS and VAT registration and health and safety policy checked before any work begins.
- Homeowner identity: the escrow provider verifies identity and bank details, for anti-fraud and anti-money-laundering compliance.
- Property risk screening: the age and type of the property trigger asbestos, party-wall and structural checks where needed.
During the work
- Daily site diary: who is on site, hours and blockers, as a record for resolving disputes.
- Hold-point checks: quality checks in person at critical stages before work is covered up, with photo evidence taken by the PM. Photos alone can be edited, so the record rests on what the PM saw on site.
- Payments: each stage is funded before it starts; the PM signs off the work, then the homeowner approves the payment.
- Health and safety: RAMS uploaded, inductions logged, RIDDOR and COSHH registers kept.
- Variations: changes within an agreed tolerance are approved by the PM and reported to the homeowner straight away. Anything beyond it, or any change the homeowner asks for, needs the homeowner's signature.
At completion
- Commissioning tests: RCD tests, ventilation flow and appliance documentation.
- Building Control: requirements flagged early, inspections coordinated and certificates stored.
- Retrofit measures recorded: type, quantity and EPC impact where known, for policy reporting.
- One-month revisit: anything that shows up after completion is recorded and fixed, before the final 5% is released.
- Digital archive: the evidence pack is hashed and stored against the property, as a permanent audit trail.
Policy Priorities BuildROI Speaks To
1. Quality of work and consumer protection
The problem: government says more than one in four UK adults who had home improvements done in the past 18 months experienced problems, and estimates that people lost over £10.3 billion on home and garden maintenance in 2024 through losses, overpriced work or unfair practices (a survey-based estimate with a wide margin of error).
What the pilot would test: whether independent verification, evidence on payment and hold-point checks reduce disputes and defects, and whether the evidence is good enough to rely on.
2. Retrofit and net zero
The problem: confidence in the quality of retrofit work matters for delivery. The Chartered Trading Standards Institute has warned that publicly funded schemes such as the Warm Homes Plan can give fraudulent traders an opportunity.
What the pilot would test: whether photo evidence of each measure, with EPC impact recorded, gives government reportable, auditable progress.
3. Builder pensions
The problem: many builders are self-employed, and the Second Pensions Commission's interim report found that only 17% of self-employed people save into a pension, falling to 4% of those who earn only from self-employment. Among self-employed people earning over £10,000, the IFS found the share saving fell from 60% in 1998 to 22% in 2022.
What the pilot would test: how many builders want a pension, and what would make it worth their while. Nothing is paid in the pilot.
Why this matters later: government already spends around £11.7 billion a year on means-tested support for pensioners, and every builder who retires with savings of their own is less likely to need it. Someone who has stood on their own two feet all their working life should be able to retire that way too, and a trade that offers that is easier to recommend to the 47,860 new workers a year the industry needs.
4. Skills and succession
The problem: construction's workforce is ageing. CITB research found that by the end of 2017, one in five construction workers was over 55, and their knowledge is hard to hand on.
What the pilot would test: whether ex-builders can work as Project Managers and mentors, and what the performance data shows about where each is strongest.
Sources: UK Government, 28 August 2026; CTSI; Consumer Detriment Survey 2024 (CMA/NatCen); CITB, Fuller Working Lives in Construction, 2018; Second Pensions Commission, Interim Report, 2026; IFS, Private pensions for the self-employed, 2024; IFS, Means-tested support beyond state pension age; CITB, Construction Workforce Outlook 2025–29.
What Would Be Reported
Government would receive the independent evaluator's report and BuildROI's own Pilot Outcome Report. Between them, they would cover:
- Each project: completion rate, time to completion, cost against estimate, snag count, issues found at the one-month revisit, rework incidents, homeowner satisfaction, builder quality rating, health and safety incidents, and Building Control pass or fail.
- Retrofit measures: type installed, EPC ratings before and after where known, installation quality, compliance with standards such as PAS 2035 and MCS, and cost per tonne of CO₂e saved.
- The workforce: ex-builders working as Project Managers, the succession pipeline, and builders' interest in a pension.
- System health: dispute rates, payment release speed, quality failure rates, compliance issues and satisfaction trends.
The Pilot in Brief
Completed within one year, a mixed set of about 30 home improvement jobs of £50,000 and above (MMC, retrofit and renovation, and traditional builds, including larger single-home builds), independent Project Manager verification in person at every milestone, and an independent evaluator chosen and paid by government. Each job starts only once it is confirmed. If the evidence says no, it stops.
See the full ask on the For Government page →The Pilot, Month by Month
Everything is completed within 12 months of the funding decision: about two months confirming jobs and setting up, around nine months in which the jobs run, each starting as soon as it is confirmed, and a final month for the reports.
- Months 1–2 — Jobs confirmed and set-up
BuildROI and the delivery partner line up the jobs, from the partner's own pipeline and from contacts introduced by the partner and government. Each job is confirmed with the consent of the homeowner and the builder. The main funding is released, and the Project Managers are hired, only when an agreed minimum number of jobs is confirmed. Alongside this, the team is contracted, evidence storage and templates are set up, legal review takes place, and Project Managers and admin practise on mock milestones.
- Months 2–3 — First jobs and first evidence
The first confirmed jobs start. Factory staff are briefed, factory inspections begin, and the first milestones are verified on site. The government-appointed evaluator starts about 6–8 weeks after the first job begins and receives everything gathered since day 1.
- Months 4–8 — Full rhythm
The remaining jobs start in turn, the last by about month 8. Installation inspections cover placement, connections, weatherproofing and final fix, each signed off by the PM before the homeowner approves payment. Evidence becomes predictable and repeatable, the dispute process is tested, compliance bodies review samples of the evidence, and insurers give feedback where involved.
- Months 9–11 — Completions and revisits
Jobs complete, with final inspections and sign-offs. Each job's one-month revisit records anything that has shown up since completion, so the last jobs finish by about month 10.
- Month 12 — Outcome
The evaluator reports to government and BuildROI delivers its Pilot Outcome Report. Government decides whether to go further.
Why This Could Work
Evidence before expansion. Each phase only proceeds if the one before it justifies it.
Prevention over cure. The idea is that quality verified up front costs less than putting problems right afterwards. The pilot would test this.
A self-improving system. Good builders should get more work, and poor practice should be easier to spot. The pilot would test whether that happens.
Audit-ready by design. Every project would generate evidence that supports Building Control, health and safety and policy reporting. Personal data would be handled under data protection law, with legal review.
Useful across government. The same evidence could inform retrofit, housing, pensions, trade and safety policy.
🏛️ See the Illustrative Analytics Pack
A specimen report showing what government would receive from a funded pilot. It is built on modelled figures and market cost research, not on completed projects, and it exists to show what the real version would look like.
View the Illustrative Analytics Pack (PDF) →