Current Position: BuildROI is at proposal stage: no live projects have been completed. This journey describes how the pilot would work for a builder.

1. Getting Verified

Quick verification before you take jobs

Step 1 You provide
Credentials Check

Upload your insurance certificates, CIS/VAT numbers, and H&S policy. These are verified before you can take jobs.

Why it matters:

Shows homeowners and government you're legitimate. One-time setup protects everyone. BuildROI never helps hide income from HMRC.

Step 2 You upload
Baseline Photos

Take 3-6 photos of the current space and access points before quoting, dated and located.

Why it matters:

Creates a 'before' record that protects you from disputes later.

2. Scoping & Pricing

Build your quote with clear scope and milestones

Step 3 You build scope
Structured Scope

Use templates to build your scope. The templates suggest milestones based on job type.

Why it matters:

Faster quoting, clearer payment milestones, less rework.

Step 4 You identify risks
Risk Register

Log known risks (long-lead items, supply issues) with mitigation plans.

Why it matters:

Protects you when things outside your control cause delays.

Step 5 You plan timeline
Realistic Schedule

Build a realistic schedule with float. The PM reviews it to ensure durations are achievable.

Why it matters:

Sets realistic expectations, not promises you can't keep.

Step 6 You confirm
Building Control

Confirm whether Building Control notification is needed and who's the duty holder.

Why it matters:

Avoids compliance issues and delays at handover.

3. Contract & H&S

Clear terms and safety documentation

Step 7 You sign
Digital Contract

Review and sign the contract. Terms are clear: payment milestones, change rules, evidence requirements.

Why it matters:

Protects you legally and ensures a fair payment process.

Step 8 You specify
Warranties

State your workmanship warranty terms. Manufacturer warranties for products are listed separately.

Why it matters:

Clear promises, no confusion about what you're covering.

Step 9 You upload
RAMS & Induction

Upload Risk Assessments and Method Statements. Log site induction attendance. Maintain RIDDOR/COSHH registers.

Why it matters:

Legal requirement. Protects your crew and shows due diligence.

4. Pre-start Prep

Get everything ready before day one

Step 10 You order
Materials & Delivery

Raise POs and lock in delivery windows to match the programme. BuildROI tracks delivery dates.

Why it matters:

Avoids idle time waiting for materials.

Step 11 You plan
Waste Management

Plan the waste removal route. Provide your carrier licence, get transfer notes, set recycling targets.

Why it matters:

Legal duty of care. Prevents fly-tipping issues and fines.

Step 12 You arrange
Skip & Welfare

Arrange a skip (with a permit if on-road). Provide site welfare: toilet, washing, drinking water, rest space.

Why it matters:

Legal requirement even on small domestic jobs. Shows professionalism.

Step 13 You participate
Kick-off Call

Join the PM and homeowner to align on start date, site rules, and communication frequency.

Why it matters:

Everyone on the same page from day one.

5. Delivery

Do the work with clear documentation

Step 14 You log daily
Site Diary

The site lead logs who's on site, hours and blockers daily. It takes a few minutes.

Why it matters:

Creates a transparent record, helps resolve disputes, shows you were professional.

Step 15 You request approval
Variations

When changes are needed, your PM can approve small unforeseen changes within the tolerance agreed in the contract, and tells the homeowner straight away. Anything beyond that, or any change the homeowner asks for, needs the homeowner's signature before the work goes ahead.

Why it matters:

Agreed changes are recorded, so you're paid for extras and there are no arguments later.

Step 16 You pause for checks
Hold-point QA

At key points (ceiling flatness, first-fix tests, tile samples) work pauses for your PM's quality check before it's covered up. Your QA lead acknowledges the result.

Why it matters:

Catches defects when they're cheap to fix. Proves quality.

Step 17 You log incidents
Incidents & Near Misses

Log any incidents or near misses with photos and corrective actions taken.

Why it matters:

Shows due diligence, improves safety, prevents repeat issues.

Step 18 You work through snags
Running Snag List

Your PM keeps a running snag list throughout the project, with owners and target dates. You clear items as they're fixed.

Why it matters:

Prevents a big snag list at the end. Shows you're on top of quality.

Step 19 Your PM takes photos
Milestone Evidence

At each milestone, your PM takes three types of photo: wide, detail and measurement, dated and stamped. You can add your own photos, which are labelled as builder-supplied.

Why it matters:

Unlocks payment promptly. Objective proof of quality, from the person verifying it.

6. Completion

Final checks and professional handover

Step 20 You commission
Testing & Commissioning

Complete RCD tests, capture appliance docs, test ventilation flow. Document everything.

Why it matters:

Safety, warranty validity, professional finish.

Step 21 You walk through
Final QA with PM & Homeowner

Walk the job with your PM and the homeowner. Your PM sorts anything found into four groups: safety and compliance, and function and performance, which must be fixed, and cosmetic items judged against UK finish tolerances. Fix dates and photo evidence are agreed for each item.

Why it matters:

A clean finish line. Everyone agrees what's done and what's left.

Step 22 You participate
Fair Finish Framework

Use UK finish tolerances to determine what needs fixing and what's within spec.

Why it matters:

Objective standards protect you from unreasonable demands.

7. Payment & Recognition

Get paid and build your reputation

Step 23 You receive
Final Payment

Once the PM approves, escrow releases the final payment. An optional small retention for the defects period may be held if agreed.

Why it matters:

You get paid promptly. A fair balance with homeowner assurance.

Step 24 You receive feedback
Feedback & Score

Both sides leave a short, factual note, shared between you, the PM and the homeowner. It is never public and expires after 24 months. Your PM also leaves a private quality rating, which updates your builder score.

Why it matters:

Good work builds your reputation. It is fair because homeowners are rated too.

Step 25 You provide support
Warranty Period

Respond to any warranty claims within the agreed timescale. BuildROI tracks your responsiveness.

Why it matters:

Good aftercare builds long-term reputation and repeat business.

Your BuildROI Benefits

Payment against verified work: escrow protects your staged payments, and verified evidence releases the money promptly.

Clear standards: UK tolerances mean objective quality measures, not opinion.

Recognition: a verified track record that may lead to more work.

Pensions: nothing is paid in the pilot. If it works, the aim is to help builders build a pension, with any incentives designed on the evidence.

Protection: documentation protects you in disputes. A transparent process means fewer arguments.

📋